Malaysia considers participation in Embraer supply chain
Discussions with the Brazilian company could open the way to explore collaboration on Malaysia’s local downstream ecosystem, the defence minister said.
Foreign and domestic investment, new plants, expansion plans and funding.
Discussions with the Brazilian company could open the way to explore collaboration on Malaysia’s local downstream ecosystem, the defence minister said.
The 499-unit project is the builder’s second property development and is scheduled to take 36 months to construct.
The association also wants foreign investment assessed by local procurement, supplier participation and transfers of technology and knowledge.
A survey of 333 businesses found 95.8% favoured postponing an immediate nationwide increase and introducing any higher wage floor in phases.
The restrictions will support Mutiara Line LRT utility works, with closures scheduled from 10pm to 5am until Dec 31.
System testing and trial runs are targeted to finish by Dec 31, with third-party safety certification and approvals from both countries factored into the schedule.
Manufacturing respondents reported RM42.86 billion in project costs within their Malaysian operations for 2024-2025, almost 51 per cent above the previous survey.
The proposed facility in Yan is due to start operating by the end of 2030 and would offer an alternative to supplies from PETRONAS.
The JS-SEZ master plan is due to be launched at the 13th Malaysia-Singapore Leaders’ Retreat on Dec 4 and 5.
The proposed purchase covers a leased printing site in Malang. Three group units also secured new or extended supply arrangements with BAT.